§ 106-261. Provision by users of necessary pretreatment facilities.
Latest version.
Users shall provide necessary wastewater treatment as required to comply with all
applicable pretreatment standards and requirements within the time limitations specified
by applicable law or regulation, and as required to comply with the requirements of
a user permit or order issued pursuant to this article. All facilities required to
pretreat discharges shall be provided, operated, and maintained at the user's sole
expense. Detailed, professionally signed and sealed plans showing the pretreatment
facilities, specifications, and operating procedures shall be submitted to the POTW
for review and approval prior to construction. The POTW may approve, approve with
conditions, or disapprove the plans, specifications and operating procedures. A user
shall not begin discharging from the treatment facilities until facilities have been
approved and all conditions and requirements of the approval have been met as determined
by the POTW. The review and approval by the POTW of such plans and operating procedures
does not in any way relieve the user from the responsibility of modifying the facility
as necessary to produce an effluent acceptable to the POTW under the provisions of
this article. Any subsequent changes in the pretreatment facilities or method of operation
shall be reported to and be approved by the POTW prior to the user's initiation of
the changes. (Users shall notify the POTW regarding the installation of new pretreatment
facilities or modification of existing facilities as provided by section 106-147 of this article.)
(Ord. No.
2017-5
, § 2, 5-15-17)
var val = document.getElementById('citecontent').innerHTML;
art.dialog.defaults.title = window.location.href;
art.dialog.data('cite', val);
art.dialog.data('homeDemoPath', '/Scripts/plus/artDialog/');
art.dialog.open('/Scripts/plus/artDialog/citeiframe.html');